Reliability of the CRBRP Shutdown Heat Removal System [electronic resource]
The failure probability per year of the shutdown heat removal system (SHRS) of the Clinch River Breeder Reactor Plant is calculated for the loss of off-site power (LOSP) initiator. Only the case in which reactor operation is not permitted on less than 3 loops is considered. The design studied includ...