PM-1 NUCLEAR POWER PLANT PROGRAM. Quarterly Progress Report No. 4 for December 1, 1959 to February 29, 1960 [electronic resource]

The objective of the contract is the design, development, fabrication, installation, and initial testing and operation of a prepackaged air- transportable pressurized water reactor nuclear power plant, the PM-I. The specified output is 1 Mw(e) and 7 million Btu/hr of heat. The plant is to be operati...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access (via OSTI)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : U.S. Atomic Energy Commission ; distributed by the Office of Scientific and Technical Information, U.S. Department of Energy, 1960.
Subjects:

Internet

Online Access (via OSTI)

Online

Holdings details from Online
Call Number: E 1.99:mnd-m-1815
E 1.99:mnd-m-1815 Available