Feasibility of determination of low-head hydroelectric power development at existing sites [electronic resource] : Brighton Dam hydroelectric development. Feasibility report.

The redevelopment of the hydroelectric facility at Brighton Dam near Laurel, Maryland has been found to be both technically and financially feasible, the benefit to cost ratio being 1.53:1 compared with an equivalent coal-based generation source. Environmental impacts have been assessed as relativel...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Format: Government Document Electronic eBook
Language:English
Published: Oak Ridge, Tenn. : distributed by the Office of Scientific and Technical Information, U.S. Department of Energy, 1979.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:doe/id/01787-1
E 1.99:doe/id/01787-1 Available