Photovoltaic concentrator application experiment, Phase I [electronic resource] : a 150 KW photovoltaic concentrator power system for load-center applications with feedback into the utility grid. Final report, June 1, 1978--March 31, 1979.

A 150-kW-peak concentrator-type photovoltaic power system to supply a multiple building load application in the Columbus, Ohio area was designed and analyzed by a Battelle-led team. The system will operate in parallel with the utility grid (which provides backup power) to supply either or both of tw...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Main Authors: Alexander, G (Author), Noel, G T (Author), Stember, L H (Author), Stickford, G H (Author), Smail, H E (Author), Broehl, J H (Author), Carmichael, D C (Author)
Corporate Author: Battelle Memorial Institute (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : United States. Department of Energy. ; distributed by the Office of Scientific and Technical Information, U.S. Department of Energy, 1979.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:doe/cs/34267--1
E 1.99:doe/cs/34267--1 Available