High-temperature turbine technology program. Turbine subsystem design report [electronic resource] : Low-Btu gas.

The objective of the US Department of Energy High-Temperature Turbine Technology (DOE-HTTT) program is to bring to technology readiness a high-temperature (2600/sup 0/F to 3000/sup 0/F firing temperature) turbine within a 6- to 10-year duration, Phase II has addressed the performance of component de...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Main Author: Horner, M.W (Author)
Corporate Author: General Electric Company (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Cincinnati, Ohio : Oak Ridge, Tenn. : General Electric Company ; distributed by the Office of Scientific and Technical Information, U.S. Department of Energy, 1980.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:doe/et/10340-t3
E 1.99:doe/et/10340-t3 Available