REFUELING-CORE 1, SEED 1 RADIATION SURVEY OF SCRAM SHAFT ASSEMBLIES. Test Results T-643704 [electronic resource]

A test was conducted to determine the radiation level of several scram shaft assemblies after their removal from the reactor vessel during Core 1 Seed 1 refueling. Data on radiation levels near the assemblies 75 days after shutdown are given. (J.R.D.)

Saved in:
Bibliographic Details
Online Access: Online Access
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : U.S. Atomic Energy Commission ; distributed by the Office of Scientific and Technical Information, U.S. Department of Energy, 1960.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:dlcs-3180101
E 1.99:dlcs-3180101 Available