RADIATION SURVEY OF BEWI AND ASEWI REFUELING. CORE 1, SEED 1. Test Results T-643709 [electronic resource]
The radiation survey of the Blanket Exit Water Instrumentation assemblies Core I, Seed 1 was performed on January 15 and 16, 1960, approximately 100 days after reactor shutdown at 5806 EFPH. The observed radiation levels varied with height from 150 to 500 mr/hr; the highest activity was found at the...
Saved in:
Online Access: |
Online Access |
---|---|
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Washington, D.C. : Oak Ridge, Tenn. :
U.S. Atomic Energy Commission ; distributed by the Office of Scientific and Technical Information, U.S. Department of Energy,
1961.
|
Subjects: |
Internet
Online AccessOnline
Call Number: |
E 1.99:dlcs-3200101
|
---|---|
E 1.99:dlcs-3200101 | Available |