RADIATION SURVEY OF BEWI AND ASEWI REFUELING. CORE 1, SEED 1. Test Results T-643709 [electronic resource]

The radiation survey of the Blanket Exit Water Instrumentation assemblies Core I, Seed 1 was performed on January 15 and 16, 1960, approximately 100 days after reactor shutdown at 5806 EFPH. The observed radiation levels varied with height from 150 to 500 mr/hr; the highest activity was found at the...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : U.S. Atomic Energy Commission ; distributed by the Office of Scientific and Technical Information, U.S. Department of Energy, 1961.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:dlcs-3200101
E 1.99:dlcs-3200101 Available