LOFT suppression tank spray system piping [electronic resource] : heat exchanger BS-H-31 piping modifications.
A stress analysis of the piping modification, resulting from relocation of heat exchanger BS-H-31 of the LOFT Blowdown Suppressing Tank Spray System, was performed. The piping, fittings, and supports were found to comply with the criteria of Section III of the ASME Boiler and Pressure Vessel Code, 1...
Saved in:
Online Access: |
Online Access |
---|---|
Corporate Authors: | , |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Idaho Falls, Idaho : Oak Ridge, Tenn. :
Idaho National Engineering and Environmental Laboratory ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,
1977.
|
Subjects: |
Internet
Online AccessOnline
Call Number: |
E 1.99: re-a-77-124
|
---|---|
E 1.99: re-a-77-124 | Available |