High flux isotope reactor. Quarterly report, April, May, and June, 1979 [electronic resource]
Routine reactor operation with four end-of-cycle shutdowns, one scheduled shutdown for analysis of servo problems, and one unscheduled shutdown resulted in an on-stream time of 87.4%. Scheduled reactor component replacement and the semiannual reactor component inspection were completed.
Saved in:
Online Access: |
Online Access |
---|---|
Corporate Author: | |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Oak Ridge, Tenn. : Oak Ridge, Tenn. :
Oak Ridge National Laboratory. ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,
1979.
|
Subjects: |
Summary: | Routine reactor operation with four end-of-cycle shutdowns, one scheduled shutdown for analysis of servo problems, and one unscheduled shutdown resulted in an on-stream time of 87.4%. Scheduled reactor component replacement and the semiannual reactor component inspection were completed. |
---|---|
Item Description: | Published through SciTech Connect. 10/01/1979. "ornl/tm-7087" McCord, R.V.; Corbett, B.L.; Poteet, K.H. |
Physical Description: | Pages: 21 : digital, PDF file. |