High flux isotope reactor. Quarterly report, April, May, and June, 1979 [electronic resource]

Routine reactor operation with four end-of-cycle shutdowns, one scheduled shutdown for analysis of servo problems, and one unscheduled shutdown resulted in an on-stream time of 87.4%. Scheduled reactor component replacement and the semiannual reactor component inspection were completed.

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: Oak Ridge National Laboratory (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Oak Ridge, Tenn. : Oak Ridge, Tenn. : Oak Ridge National Laboratory. ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1979.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:ornl/tm-7087
E 1.99:ornl/tm-7087 Available