Solar cogeneration [electronic resource] : Cimarron River station, Central Telephone and Utilities-Western Power.

The site-specific conceptual design progress is described for a solar central receiver cogeneration facility at a Kansas utility. The process is described which led to the selection of the preferred solar cogeneration facility. The status of the conceptual design is presented. The evaluation of syst...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: Babcock & Wilcox Company (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Oak Ridge, Tenn. : distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1981.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:doe/sf/11439-t1
E 1.99:doe/sf/11439-t1 Available