Bates solar industrial process steam application environmental impact assessment [electronic resource]
It is planned to install 34,440 square feet of linear parabolic trough solar collectors at a new corrugator plant for making corrugated boxes. The system is to operate in parallel with a fossil fuel boiler. An assessment is presented of the impacts of the solar energy system on the existing environm...
Saved in:
Online Access: |
Online Access |
---|---|
Corporate Author: | |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Oakland, Calif. : Oak Ridge, Tenn. :
United States. Dept. of Energy. Oakland Operations Office ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,
1981.
|
Subjects: |
Internet
Online AccessOnline
Call Number: |
E 1.99:bdm/a-80-025-tr
|
---|---|
E 1.99:bdm/a-80-025-tr | Available |