Grid connected Integrated Community Energy System [electronic resource] : Phase II. Detailed feasibibility analysis and preliminary design. Final report, Stage 2. Volume 1. Executive summary.

The preliminary design and cost analysis of a proposed Integrated Community Energy System (ICES) to serve a multi-million square footage medical complex of the Health Education Authority of Louisiana are presented. This ICES is designed as a multi-fuel plant (coal or natural gas), operation is to be...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Format: Government Document Electronic eBook
Language:English
Published: Oak Ridge, Tenn. : distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1978.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:coo-4337-2/1
E 1.99:coo-4337-2/1 Available