PERIODIC REACTOR PLANT LEAK RATE TEST. CORE 1, SEED 2. Test Results T- 641102. First Issue, JUNE 14, 1961 [electronic resource]

Tests were performed on the Shippingport PWR to determine the magnitude and location of coolant system leakages. The total leakage from pressurizer relief and reactor relief valves was 62.1 gal/hr. The total plant leakage was 19.3 gal/hr. (T.F.H.)