Geopressured-geothermal well report. Volume I. Drilling and completion [electronic resource]
Gladys McCall site activities are covered through the completion of the test well and salt water disposal well. The test well was drilled to a total depth of 16,510 feet, then plugged back to 15,831 feet. Three 4'' diameter diamond cores were taken for analysis. An existing well on site, t...
Saved in:
Online Access: |
Online Access |
---|---|
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Oak Ridge, Tenn. :
distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,
1982.
|
Subjects: |
Internet
Online AccessOnline
Call Number: |
E 1.99:doe/et/27217-2-vol.1
|
---|---|
E 1.99:doe/et/27217-2-vol.1 | Available |