Load management alternatives to transmission and distribution construction [electronic resource] : Toledo-Wren case study.

This paper describes the development of a method to predict the feasibility of using load management as an alternative to construction of transmission and distribution capacity. A forecasting model was developed and applied to a particular case. Several problems were identified in the test case, nec...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Authors: Pacific Northwest Laboratory (Researcher), Pacific Northwest National Laboratory (U.S.) (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Richland, Wash. : Oak Ridge, Tenn. : Pacific Northwest National Laboratory (U.S.) ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1987.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:pnl-5931
E 1.99:pnl-5931 Available