Molten-caustic-leaching (Gravimelt) system integration project. Quarterly report, April--June 1989 [electronic resource]

Operation of the Gravimelt Integrated Test Circuit for desulfurization and demineralization of coal has been completed. A 48-test process matrix was performed over 750 hours of operational time resulting in production of 3,000 pounds of treated coal suitable for further test and evaluation. Optimiza...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Authors: TRW Inc. Space and Technology Group. Applied Technology Division (Researcher), National Energy Technology Laboratory (U.S.) (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : United States. Dept. of Energy ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1989.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:doe/pc/91257--t25
E 1.99:doe/pc/91257--t25 Available