Calculated fission product release from PRTR rupture [electronic resource]

Approximately 15 minutes after shutdown on August 21, 1962, evidence of a rupture was observed in the form of high radiation levels in the containment vessel and rupture monitor indications. Discharge of a special MgO-PuO₂ test element revealed a cladding break of about 1.5 inches in length and abou...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Authors: Hanford Atomic Products Operation (Researcher), Hanford Site (Wash.) (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : United States. Dept. of Energy ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1962.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:hw--75045
E 1.99:hw--75045 Available