Forced-air cooling of a WIPP mine drift. [Waste Isolation Pilot Plant] [electronic resource]

A one-dimensional model has been developed to predict the time, t*, required to cool a Waste Isolation Pilot Plant (WIPP) mine drift. Comparisons have been made with a two-dimensional model and are found to be in good agreement for four months less than or equal to t* less than or equal to two years...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Authors: Sandia Laboratories (Researcher), Sandia National Laboratories (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Albuquerque, N.M. : Oak Ridge, Tenn. : Sandia National Laboratories. ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1978.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:sand-78-1122
E 1.99:sand-78-1122 Available