TESTING AND ANALYSIS OF CAP CONCRETE STRESS AND STRAIN DUE TO SHRINKAGE, CREEP, AND EXPANSION FINAL REPORT [electronic resource]

In-situ decommissioning of Reactors P- and R- at the Savannah River Site will require filling the reactor vessels with a special concrete based on materials such as magnesium phosphate, calcium aluminate or silica fume. Then the reactor vessels will be overlain with an 8 ft. thick layer of Ordinary...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: United States. Department of Energy. Savannah River Site (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : United States. Dept. of Energy ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 2011.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:srnl-sti-2010-00771
E 1.99:srnl-sti-2010-00771 Available