Dynamometer Testing of Samsung 2.5MW Drivetrain [electronic resource] : Cooperative Research and Development Final Report, CRADA Number CRD-08-311.
SHI's prototype 2.5 MW wind turbine drivetrain was tested at the NWTC 2.5 MW dynamometer test facility over the course of 4 months between December 2009 and March 2010. This successful testing campaign allowed SHI to validate performance, safety, control tuning, and reliability in a controlled...
Saved in:
Online Access: |
Online Access (via OSTI) |
---|---|
Corporate Author: | |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Washington, D.C. : Oak Ridge, Tenn. :
United States. Department of Energy. Office of Energy Efficiency and Renewable Energy ; distributed by the Office of Scientific and Technical Information, U.S. Department of Energy,
2011.
|
Subjects: |
Internet
Online Access (via OSTI)Online
Call Number: |
E 1.99:nrel/tp-7a1-49258
|
---|---|
E 1.99:nrel/tp-7a1-49258 | Available |