WASHING AND DEMONSTRATION OF THE DWPF FLOWSHEET IN THE SRNL SHIELDED CELLS USING POST ALUMINUM DISSOLUTION TANK 51 SLUDGE SLURRY [electronic resource]

The remaining contents of Tank 51 from Sludge Batch 4 will be blended with Purex sludge from Tank 7 to constitute Sludge Batch 5 (SB5). The Savannah River Site (SRS) Liquid Waste Organization (LWO) has completed caustic addition to Tank 51 to perform low temperature Al dissolution on the H-Modified...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: United States. Department of Energy. Savannah River Site (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : United States. Dept. of Energy ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 2008.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:wsrc-sti-2008-00086
E 1.99:wsrc-sti-2008-00086 Available