Monitored Geologic Repository Life Cycle Cost Estimate Assumptions Document [electronic resource]
The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost estimate and schedule update incorporating information from the Viability Assessment (VA), License Application De...
Saved in:
Online Access: |
Online Access |
---|---|
Corporate Author: | |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Washington, D.C : Oak Ridge, Tenn. :
United States. Dept. of Energy ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,
2000.
|
Subjects: |
Internet
Online AccessOnline
Call Number: |
E 1.99:mis-mgr-ad-000002, rev 00
|
---|---|
E 1.99:mis-mgr-ad-000002, rev 00 | Available |