Precision directional drilling of hot-dry-rock geothermal production well EE-3 [electronic resource]
The deviated directional drilling of the hot dry rock (HDR) geothermal production well EE-3 (Energy Extraction No. 3) was successfully completed on August 1981. The injection well, EE-2, previously had been drilled with its lower part at an inclination of 35° to the vertical. It reached an on-line d...
Saved in:
Online Access: |
Online Access |
---|---|
Corporate Author: | |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Los Alamos, N.M. : Oak Ridge, Tenn. :
Los Alamos National Laboratory ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,
1982.
|
Subjects: |
Internet
Online AccessOnline
Call Number: |
E 1.99: conf-821007-9
|
---|---|
E 1.99: conf-821007-9 | Available |