Precision directional drilling of hot-dry-rock geothermal production well EE-3 [electronic resource]

The deviated directional drilling of the hot dry rock (HDR) geothermal production well EE-3 (Energy Extraction No. 3) was successfully completed on August 1981. The injection well, EE-2, previously had been drilled with its lower part at an inclination of 35° to the vertical. It reached an on-line d...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: Los Alamos National Laboratory (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Los Alamos, N.M. : Oak Ridge, Tenn. : Los Alamos National Laboratory ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1982.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99: conf-821007-9
E 1.99: conf-821007-9 Available