Four-feedplate operation of ZT-40 with passive crowbars [electronic resource]

This report summarizes the measurements made on the ZT-40 reversed-field pinch during the start-up on October 5, 1979, until May 1980, when the power crowbar circuitry became operational. The material contained herein pertains to the operation of ZT-40 with four current feedpoints, passive crowbars,...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: Los Alamos National Laboratory (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Los Alamos, N.M. : Oak Ridge, Tenn. : Los Alamos National Laboratory ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1982.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:la-8752-ms
E 1.99:la-8752-ms Available