Four-feedplate operation of ZT-40 with passive crowbars [electronic resource]
This report summarizes the measurements made on the ZT-40 reversed-field pinch during the start-up on October 5, 1979, until May 1980, when the power crowbar circuitry became operational. The material contained herein pertains to the operation of ZT-40 with four current feedpoints, passive crowbars,...
Saved in:
Online Access: |
Online Access |
---|---|
Corporate Author: | |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Los Alamos, N.M. : Oak Ridge, Tenn. :
Los Alamos National Laboratory ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,
1982.
|
Subjects: |
Internet
Online AccessOnline
Call Number: |
E 1.99:la-8752-ms
|
---|---|
E 1.99:la-8752-ms | Available |