Operations of the Bonifer Springs Juvenile Release/Adult Collection Facility, 1984-1985 Annual Report. [electronic resource]

The progress of the project objectives are given in this report. The project objectives are: (1) enhancement of the natural spawning summer steelhead run in the Umatilla River Drainage; (2) establishment of a hatchery produced summer steelhead run in the Umatilla River; (3) protect the Confederated...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: Confederated Tribes of the Umatilla Reservation, Oregon (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Portland, Ore. : Oak Ridge, Tenn. : United States. Bonneville Power Administration ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1986.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:doe/bp-39457-1
E 1.99:doe/bp-39457-1 Available