Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Second Quarter 1983 [electronic resource]

In the Second Quarter of 1983, the number of signed contracts and committed projects rose from 223 to 240, with a total estimated nominal capacity of these projects of 1,449 MW. Of this nominal capacity, about 361 MW is operational, and the balance is under contract for development. A map indicating...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: United States. Department of Energy. Geothermal Division (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C : Oak Ridge, Tenn. : United States. Dept. of Energy ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1983.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:883383
E 1.99:883383 Available