Site Characterization Report ORGDP Diffusion Facilities Permanent Shutdown K-700 Power House and K-27 Switch Yard/Switch House [electronic resource]

The K-700 Power House area, initially built to supply power to the K-25 gaseous diffusion plant was shutdown and disassembled in the 1960s. This shutdown was initiated by TVA supplying economical power to the diffusion plant complex. As a result of world wide over production of enriched, reactor gra...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : United States. Dept. of Energy. Office of Environmental Management ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1988.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:kd-5773
E 1.99:kd-5773 Available