Measurement control program for new special recovery. [Plutonium scrap recovery facility] [electronic resource]
This report summarizes the design of the measurement control (MC) program for the New Special Recovery facility. The MC program is divided into two levels. Level 1 MC checks are performed at the individual instrument computer and will always be functional even when the instrument-control computer is...
Saved in:
Online Access: |
Online Access |
---|---|
Corporate Author: | |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Los Alamos, N.M. : Oak Ridge, Tenn. :
Los Alamos National Laboratory ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,
1987.
|
Subjects: |
Internet
Online AccessOnline
Call Number: |
E 1.99:la-10974-ms
|
---|---|
E 1.99:la-10974-ms | Available |