Construction of a cylindrical brine test room using a tunnel boring machine [electronic resource]

This paper discusses the construction of a horizontal cylindrical brine test room at the Waste Isolation Pilot Plant (WIPP). The room was constructed in the bedded salt formation at a depth of 655 meters with a tunnel boring machine. The machine leasing, technical and operational management, paramet...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: Westinghouse Electric Corporation. Waste Isolation Division (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : United States. Dept. of Defense ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1990.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:conf-900210-64
E 1.99:conf-900210-64 Available