The Bevalac long flattop [electronic resource]

Until July of 1992, the maximum length of the Bevalac flattop was 2 seconds, limiting the beam spill to 1.5 seconds. The normal running condition was a 1.5 second flattop, with a 1.0 second beam spill. If we define the duty factor as the spill length (in time) divided by the synchrotron pulse length...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Authors: Lawrence Berkeley Laboratory (Researcher), Lawrence Berkeley National Laboratory (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : United States. Dept. of Defense ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1992.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:lbl-33089
E 1.99:lbl-33089 Available