Molten-Caustic-Leaching (Gravimelt) System Integration Project, Phase 2. Topical report for test circuit operation [electronic resource]
The objective of the task (Task 6) covered in this document was to operate the refurbished/modified test circuit of the Gravimeh Process in a continuous integrated manner to obtain the engineering and operational data necessary to assess the technical performance and reliability of the circuit. This...
Saved in:
Online Access: |
Online Access |
---|---|
Corporate Authors: | , |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Washington, D.C. : Oak Ridge, Tenn. :
United States. Dept. of Energy ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,
1993.
|
Subjects: |
Internet
Online AccessOnline
Call Number: |
E 1.99:doe/pc/91257--t16
|
---|---|
E 1.99:doe/pc/91257--t16 | Available |