Coal-fired high performance power generating system. Draft quarterly progress report, January 1--March 31, 1995 [electronic resource]

This report covers work carried out under Task 3, Preliminary R and D, under contract DE-AC22-92PC91155, ̀̀Engineering Development of a Coal-Fired High Performance Power Generation System̀̀ between DOE Pittsburgh Energy Technology Center and United Technologies Research Center. The goals of the prog...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: National Energy Technology Laboratory (U.S.) (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : United States. Dept. of Energy ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1995.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:DOE/PC/91155--T11
E 1.99:DOE/PC/91155--T11 Available