Coal-water slurry fuel combustion testing in an oil-fired industrial boiler. Semiannual technical progress report, February 15--August 15, 1996 [electronic resource]
The project consists of four phases: (1) design, permitting, and test planning, (2) construction and start up, (3) demonstration and evaluation (1,000-hour demonstration), and (4) expanded demonstration and evaluation (installing a CWSF preparation circuit, performing baseline tests firing No. 6 fue...
Saved in:
Online Access: |
Online Access |
---|---|
Corporate Author: | |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Washington, DC : Oak Ridge, Tenn. :
United States. Office of the Assistant Secretary for Fossil Energy ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,
1997.
|
Subjects: |
Internet
Online AccessOnline
Call Number: |
E 1.99:DOE/PC/88697--T13
|
---|---|
E 1.99:DOE/PC/88697--T13 | Available |