PRA-Code Upgrade to Handle a Generic Problem [electronic resource]

During the probabilistic risk assessment (PRA) for the proposed Yucca Mountain nuclear waste repository, a problem came up that could not be handled by most PRA computer codes. This problem deals with dependencies between sequential events in time. Two similar scenarios that illustrate this problem...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: Idaho National Engineering and Environmental Laboratory (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C : Oak Ridge, Tenn. : United States. Dept. of Energy. Office of Environmental Management ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1999.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:INEEL/CON-99-00746
E 1.99:INEEL/CON-99-00746 Available