Practices for closing out highway projects from substantial completion to final payment / Christofer M. Harper, Manish Parajuli, Manideep Tummalapudi, Timothy R.B. Taylor, Steve Waddle, Rachel Catchings.

Although project closeout only entails a small portion of actual construction work, closing out highway construction projects for state departments of transportation (DOTs) is a complex and vital process that is a part of project delivery for highway construction projects. The TRB National Cooperati...

Full description

Saved in:
Bibliographic Details
Online Access: Email address required to view/download the free text
Main Authors: Harper, Christofer (Author), Parajuli, Manish (Author), Tummalapudi, Manideep (Author), Taylor, Timothy R. B. (Author), Waddle, Steve (Author), Catchings, Rachel (Author)
Corporate Authors: American Association of State Highway and Transportation Officials (sponsoring body.), United States. Federal Highway Administration (sponsoring body.)
Format: Book
Language:English
Published: Washington, DC : Transportation Research Board, 2021.
Series:Synthesis of highway practice ; 570.
Subjects:

Internet

Email address required to view/download the free text

Closed Stacks - Engineering Math & Physics Library - Stacks

Holdings details from Closed Stacks - Engineering Math & Physics Library - Stacks
Call Number: TE195 .H37 2021
TE195 .H37 2021 Available Place a Hold