AGR-5/6/7 Irradiation Summary as of the End of Cycle 167A [electronic resource]

Overall, the first three cycles of irradiation proceeded as planned Items of note: Failure rate of thermocouples was higher than expected Downstream needle valves were throttled resulting in part of the exhaust flow being diverted prior to reaching the fission product monitors (this was corrected ne...

Full description

Saved in:
Bibliographic Details
Online Access: Full Text (via OSTI)
Corporate Author: Idaho National Laboratory (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : United States. Office of the Assistant Secretary for Nuclear Energy ; Distributed by the Office of Scientific and Technical Information, U.S. Department of Energy, 2020.
Subjects:

Internet

Full Text (via OSTI)

Online

Holdings details from Online
Call Number: E 1.99:inl/mis-20-59004-rev000
E 1.99:inl/mis-20-59004-rev000 Available