AGR-5/6/7 Irradiation Summary as of the End of Cycle 167A [electronic resource]
Overall, the first three cycles of irradiation proceeded as planned Items of note: Failure rate of thermocouples was higher than expected Downstream needle valves were throttled resulting in part of the exhaust flow being diverted prior to reaching the fission product monitors (this was corrected ne...
Saved in:
Online Access: |
Full Text (via OSTI) |
---|---|
Corporate Author: | |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Washington, D.C. : Oak Ridge, Tenn. :
United States. Office of the Assistant Secretary for Nuclear Energy ; Distributed by the Office of Scientific and Technical Information, U.S. Department of Energy,
2020.
|
Subjects: |
Internet
Full Text (via OSTI)Online
Call Number: |
E 1.99:inl/mis-20-59004-rev000
|
---|---|
E 1.99:inl/mis-20-59004-rev000 | Available |