Clinch River Breeder Reactor Plant [electronic resource] : hot leg pipe evaluation. Supplement to the primary pipe integrity status report.
Postulated large breaks in the primary hot-leg piping had been analyzed and the results show that no loss of core coolable geometry would occur. Further study has been performed, particularly in ascertaining the upper bounds of the consequence of such a postulated break. This was done both in terms...
Saved in:
Online Access: |
Full Text (via OSTI) |
---|---|
Corporate Author: | |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Washington, D.C. : Oak Ridge, Tenn. :
United States. Department of Energy. ; distributed by the Office of Scientific and Technical Information, U.S. Department of Energy,
1985.
|
Subjects: |
Internet
Full Text (via OSTI)Online
Call Number: |
E 1.99:ward-d--0137
|
---|---|
E 1.99:ward-d--0137 | Available |