WIPP Subsidence Monument Leveling Survey [electronic resource]
Sections 2 through 7 of this report define the result of the 2009 leveling survey through the subsidence monuments at the WIPP site. Approximately 15 miles of leveling was completed through nine vertical control loops. The 2009 survey includes the determination of elevation on each of the 48 existin...
Saved in:
Online Access: |
Full Text (via OSTI) |
---|---|
Corporate Author: | |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Washington, D.C. : Oak Ridge, Tenn. :
United States. Department of Energy. Office of Environmental Restoration and Waste Management ; distributed by the Office of Scientific and Technical Information, U.S. Department of Energy,
2009.
|
Subjects: |
Internet
Full Text (via OSTI)Online
Call Number: |
E 1.99:doe/wipp--10-2293
|
---|---|
E 1.99:doe/wipp--10-2293 | Available |