Progress on the biphase turbine at Cerro Prieto [electronic resource]

The status of a Biphase turbine power plant being installed at the Cerro Prieto geothermal field is presented. The major modules for the power plant are completed except for a back pressure steam turbine. The power plant will be started in April 1997 with the Biphase turbine alone followed by the ad...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access (via OSTI)
Corporate Author: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C. : Oak Ridge, Tenn. : United States. Department of Energy. Office of Energy Efficiency and Renewable Energy ; distributed by the Office of Scientific and Technical Information, U.S. Department of Energy, 1997.
Subjects:
Description
Summary:The status of a Biphase turbine power plant being installed at the Cerro Prieto geothermal field is presented. The major modules for the power plant are completed except for a back pressure steam turbine. The power plant will be started in April 1997 with the Biphase turbine alone followed by the addition of the steam turbine module two months later. The current power plant performance level is 2780 kWe due to a decline in the well. An increase in power output to 4060 kWe by adding the flow from another well is planned. The addition of five Biphase power plants with a total power output of 21.2 megawatts is described.
Geothermal Legacy.
Item Description:Published through SciTech Connect.
12/31/1997.
"doe/ee--0139"
" conf-970376--"
"DE98001891"
15. US Department of Energỳs geothermal program review, San Francisco, CA (United States), 24-26 Mar 1997.
Cerini, D.; Hays, L.; Studhalter, W. [Douglas Energy Company, Placentia, CA (United States)]
Physical Description:pp. 3.19-3.27 : digital, PDF file.