Progress on the biphase turbine at Cerro Prieto [electronic resource]
The status of a Biphase turbine power plant being installed at the Cerro Prieto geothermal field is presented. The major modules for the power plant are completed except for a back pressure steam turbine. The power plant will be started in April 1997 with the Biphase turbine alone followed by the ad...
Saved in:
Online Access: |
Online Access (via OSTI) |
---|---|
Corporate Author: | |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Washington, D.C. : Oak Ridge, Tenn. :
United States. Department of Energy. Office of Energy Efficiency and Renewable Energy ; distributed by the Office of Scientific and Technical Information, U.S. Department of Energy,
1997.
|
Subjects: |
Internet
Online Access (via OSTI)Online
Call Number: |
E 1.99: conf-970376--
|
---|---|
E 1.99: conf-970376-- | Available |