Suggested Topics within your search.
Suggested Topics within your search.
- Engineering Drawings 19
- Design 10
- General Studies Of Nuclear Reactors 10
- Hanford Production Reactors 8
- Nuclear Fuel Cycle And Fuel Materials 6
- Pipes 6
- Purex Process 6
- Engineering 5
- Hazards 4
- Modifications 4
- Separation Equipment 4
- Specifications 4
- Cost 3
- Cost Estimation 3
- Fluid Flow 3
- Hapo 3
- Plutonium 3
- Production 3
- Reactor Cooling Systems 3
- Capacity 2
- Compiled Data 2
- Equipment 2
- Feasibility Studies 2
- Fission Product Release 2
- Flow Rate 2
- Fuel Element Clusters 2
- Hot Cells 2
- Installation 2
- Irradiation 2
- Management Of Radioactive And Non-radioactive Wastes From Nuclear Facilities 2
-
1
Increased pumping capacity at 181-D scope and justification
Published 1960Subjects: Online Access
Government Document Electronic eBook -
2
Purex pulse column designs for capacity factor of 3.0 to 3.5
Published 1955Subjects: Online Access
Government Document Electronic eBook -
3
Gravity fed water supply to reactor storage basins
Published 1963Subjects: Online Access
Government Document Electronic eBook -
4
Replacement plutonium concentration equipment -- Purex definition of scope
Published 1956Subjects: Online Access
Government Document Electronic eBook -
5
Rear crossheader expansion joints
Published 1962Subjects: Online Access
Government Document Electronic eBook -
6
Design criteria for coolant backup three remaining smaller reactors
Published 1964Subjects: Online Access
Government Document Electronic eBook -
7
Increased production study B, D, DR, F, H and C reactors
Published 1960Subjects: Online Access
Government Document Electronic eBook -
8
Back-up radioiodine removal facilities, Purex. Project proposal, Revision 1
Published 1956Subjects: Online Access
Government Document Electronic eBook -
9
Production Test IP-333-D Irradiation of one defected UO₂ fuel element assembly.
Published 1960Subjects: Online Access
Government Document Electronic eBook -
10
Comment issue - Production Test IP-333-D Irradiation of one defected UO₂ fuel element assembly.
Published 1960Subjects: Online Access
Government Document Electronic eBook -
11
Rear face crossunder lines at B, D, DR, F, and H reactors -- Scope and justification
Published 1959Subjects: Online Access
Government Document Electronic eBook -
12
Piping changes for increased production at B, D, DR, F, C, and H reactors
Published 1960Subjects: Online Access
Government Document Electronic eBook -
13
Plutonium concentration and storage, engineering study for Purex L-Cell Package replacement
Published 1964Subjects: Online Access
Government Document Electronic eBook -
14
A Purex process two cycle plant study
Published 1955Subjects: Online Access
Government Document Electronic eBook -
15
Strontium-90 Recovery and lag storage interim program.
Published 1960Subjects: Online Access
Government Document Electronic eBook -
16
Project CGC-897--Title I design, fission product storage in B-Plant
Published 1961Subjects: Online Access
Government Document Electronic eBook -
17
100-N technical manual. Volume 2A Systems descriptions.
Published 1963Subjects: Online Access
Government Document Electronic eBook -
18
Design scope of the Z Plant Metal Control Facility, Project CGC-944
Published 1962Subjects: Online Access
Government Document Electronic eBook -
19
Prototype F-F6 demister installation at Purex for the future single-stage recovery of nitric acid from high-level wastes Definitive design.
Published 1959Subjects: Online Access
Government Document Electronic eBook