Oak Ridge Research Reactor quarterly report, April, May, and June of 1978 [electronic resource]

The ORR operated at an average power level of 27.8 MW for 72.6% of the time during April, May, and June of 1978. The reactor was shut down on fifteen occasions, two of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was higher than normal due to beam-hole-plug m...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: Oak Ridge National Laboratory (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Oak Ridge, Tenn. : Oak Ridge, Tenn. : Oak Ridge National Laboratory. ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1978.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:ornl/tm-6646
E 1.99:ornl/tm-6646 Available