Oak Ridge Research Reactor quarterly report, January-March, 1979 [electronic resource]

The ORR operated at an average power level of 28.9 MW for 84.2% of the time during January, February and March of 1979. The reactor was shut down on seventeen occasions, three of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remain...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: Oak Ridge National Laboratory (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Oak Ridge, Tenn. : Oak Ridge, Tenn. : Oak Ridge National Laboratory. ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1979.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:ornl/tm-6973
E 1.99:ornl/tm-6973 Available