Operation, modification, and maintenance of DOE/PETC 700 H. P. Combustion Test Facility. Third quarterly activity report, July 3, 1978--October 1, 1978 [electronic resource]
The General Electric Company (MATSCO) was awarded the contract to operate, modify, and maintain the DOE/PETC 700 H.P. Combustion Test Facility. The 700 H.P. Combustion Test Facility was designed and built by the Dept. of Energy at Pittsburgh Energy Research Center and its ultimate success is the res...
Saved in:
Online Access: |
Online Access |
---|---|
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Oak Ridge, Tenn. :
distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,
1978.
|
Subjects: |
Summary: | The General Electric Company (MATSCO) was awarded the contract to operate, modify, and maintain the DOE/PETC 700 H.P. Combustion Test Facility. The 700 H.P. Combustion Test Facility was designed and built by the Dept. of Energy at Pittsburgh Energy Research Center and its ultimate success is the responsibility of DOE/PETC. G.E. Co/MATSCO will provide support to assist in the goal of successful operation of this pilot plant facility. The primary objective of the DOE/PETC 700 H.P. CTF is to establish the practicality of coal oil slurry combustion as a technically, economically, and environmentally feasible retrofit technology. Adjustments and start-up operations are detailed. |
---|---|
Item Description: | Published through the Information Bridge: DOE Scientific and Technical Information. 01/01/1978. "coo-4740-2" Not Available. Management and Technical Services Co., Clairton, PA (USA) |
Physical Description: | Pages: 6 : digital, PDF file. |