Transformer requirements for the year 2000. Final report, December 1979 [electronic resource]

The principal objective of this program was to determine the design parameters required for transformers of the year 2000. The approach to meeting this objective was to determine the changes which may occur in transmission and distribution systems over the next twenty years, and how these changes mi...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Format: Government Document Electronic eBook
Language:English
Published: Oak Ridge, Tenn. : distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1980.
Subjects:

MARC

LEADER 00000nam a22000003u 4500
001 b7355086
003 CoU
005 20130312000000.0
006 m o d f
007 cr |||||||||||
008 130401e19800601||| ot f0|||||eng|d
035 |a (TOE)ost5194669 
035 |a (TOE)5194669 
040 |a TOE  |c TOE 
049 |a GDWR 
072 7 |a 24  |2 edbsc 
086 0 |a E 1.99:doe/ra/3291-01 
086 0 |a E 1.99:doe/ra/3291-01 
088 |a doe/ra/3291-01 
245 0 0 |a Transformer requirements for the year 2000. Final report, December 1979  |h [electronic resource] 
260 |a Oak Ridge, Tenn. :  |b distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,  |c 1980. 
300 |a Pages: 203 :  |b digital, PDF file. 
336 |a text  |b txt  |2 rdacontent. 
337 |a computer  |b c  |2 rdamedia. 
338 |a online resource  |b cr  |2 rdacarrier. 
500 |a Published through the Information Bridge: DOE Scientific and Technical Information. 
500 |a 06/01/1980. 
500 |a "doe/ra/3291-01" 
500 |a Not Available. 
500 |a Westinghouse Electric Corp., Pittsburgh, PA (USA) 
520 3 |a The principal objective of this program was to determine the design parameters required for transformers of the year 2000. The approach to meeting this objective was to determine the changes which may occur in transmission and distribution systems over the next twenty years, and how these changes might affect design parameters of distribution and power transformers. Emphasis was placed on domestic requirements, although the impact of international practices was factored into the overall requirements for transformers. Possible investigations that could help transformer designers meet the long term technical requirements of future transformers were also identified. The principal conclusions of this study were: 1200 kV transmission could be in service by the late 1980's and it is essential to develop 1200 kV transformers for these systems; transformer manufacturers must be prepared to supply higher MVA ratings at all voltage levels; there will be a strong demand for low-loss, minimum cost transformers; and environmental/safety, reliability, and size reduction considerations will increase in importance. (LLL) 
536 |b ET-78-C-01-3291. 
650 7 |a Design.  |2 local. 
650 7 |a Electrical Equipment.  |2 local. 
650 7 |a Power Transmission Lines.  |2 local. 
650 7 |a Forecasting.  |2 local. 
650 7 |a Transformers.  |2 local. 
650 7 |a Public Utilities.  |2 local. 
650 7 |a Equipment.  |2 local. 
650 7 |a Electric Utilities.  |2 local. 
650 7 |a Power Distribution.  |2 local. 
650 7 |a Specifications.  |2 local. 
650 7 |a Power Systems.  |2 local. 
650 7 |a Power Transmission And Distribution.  |2 edbsc. 
710 1 |a United States.  |b Department of Energy.  |b Office of Scientific and Technical Information.  |4 dst. 
856 4 0 |u http://www.osti.gov/servlets/purl/5194669/  |z Online Access 
907 |a .b73550863  |b 03-07-23  |c 04-24-13 
998 |a web  |b 04-24-13  |c f  |d m   |e p  |f eng  |g    |h 0  |i 1 
956 |a Information bridge 
999 f f |i ae0c19c4-b69a-5bd9-96cf-0f20f19e0acd  |s 98c7c346-6dfb-59cd-9ac4-26736adad38b 
952 f f |p Can circulate  |a University of Colorado Boulder  |b Online  |c Online  |d Online  |e E 1.99:doe/ra/3291-01  |h Superintendent of Documents classification  |i web  |n 1