THE EBR-I MELTDOWN--PHYSICAL AND METALLURGICAL CHANGES IN THE CORE. Final Report--Metallurgy Program 7.2.18 [electronic resource]

As a result of the partial meltdown which occurred in EBR-1 on November 29, 1955, it was necessary to remove the core assembly from the reactor and to separate the enriched fuel section from upper and lower unenriched blanket sections. A temporary cave was constructed on top of the reactor in order...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Author: Argonne National Laboratory (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Argonne, Ill. : Oak Ridge, Tenn. : Argonne National Laboratory ; distributed by the Office of Scientific and Technical Information, U.S. Department of Energy, 1957.
Subjects:

Internet

Online Access

Online

Holdings details from Online
Call Number: E 1.99:anl-5731
E 1.99:anl-5731 Available