Utility advanced turbine systems (ATS) technology readiness testing [electronic resource]

The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the US Department of Energy (DOE) is the development of a highly efficient, environmentally superior, and cost-competitive utility ATS for base-load utility-scale power generation, the GE 7H (60 H...

Full description

Saved in:
Bibliographic Details
Online Access: Online Access
Corporate Authors: Federal Energy Technology Center (U.S.) (Researcher), National Energy Technology Laboratory (U.S.) (Researcher)
Format: Government Document Electronic eBook
Language:English
Published: Washington, D.C : Oak Ridge, Tenn. : United States. Dept. of Energy ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 2000.
Subjects:
Search Result 1

UTILITY ADVANCED TURBINE SYSTEMS(ATS) TECHNOLOGY READINESS TESTING

Published 2001
Online Access
Government Document Electronic eBook
Search Result 2

UTILITY ADVANCED TURBINE SYSTEMS (ATS) TECHNOLOGY READINESS TESTING

Published 1999
Online Access
Government Document Electronic eBook
Search Result 3

UTILITY ADVANCED TURBINE SYSTEMS (ATS) TECHNOLOGY READINESS TESTING

Published 1999
Online Access
Government Document Electronic eBook
Search Result 4

Utility Advanced Turbine Systems (ATS) technology readiness testing

Published 1999
Online Access
Government Document Electronic eBook
Search Result 5

Utility Advanced Turbine Systems (ATS) Technology Readiness Testing

Published 1998
Online Access
Government Document Electronic eBook
Search Result 6

UTILITY ADVANCED TURBINE SYSTEMS (ATS) TECHNOLOGY READINESS TESTING

Published 1998
Online Access (via OSTI)
Government Document Electronic eBook