Cask system maintenance in the Federal Waste Management System [electronic resource]
In early 1988, in support of the development of the transportation system for the Office of Civilian Radioactive Waste Management System (OCRWM), a feasibility study was undertaken to define a the concept for a stand-alone, green-field'' facility for maintaining the Federal Waste Managemen...
Saved in:
Online Access: |
Online Access |
---|---|
Corporate Author: | |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Las Vegas, Nev : Oak Ridge, Tenn. :
United States. Dept. of Energy. Office of Civilian Radioactive Waste Management ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,
1991.
|
Subjects: |
Summary: | In early 1988, in support of the development of the transportation system for the Office of Civilian Radioactive Waste Management System (OCRWM), a feasibility study was undertaken to define a the concept for a stand-alone, green-field'' facility for maintaining the Federal Waste Management System (FWMS) casks. This study provided and initial layout facility design, an estimate of the construction costs, and an acquisition schedule for a Cask Maintenance Facility (CMF). It also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs derived from the study have been organized for use in the total transportation system decision-making process. Most importantly, they also provide a foundation for continuing design and planning efforts. The feasibility study was based on an assumed stand-alone, green-field'' configuration. This design approach provides a comprehensive design evaluation, to guide the development of a cost estimate and to permit flexibility in locating the facility. The following sections provide background information on cask system maintenance, briefly summarizes some of the functional requirements that a CMF must satisfy, provides a physical description of the CMF, briefly discusses the cost and schedule estimates and then reviews the findings of the efforts undertaken since the feasibility study was completed. 15 refs., 3 figs. |
---|---|
Item Description: | Published through the Information Bridge: DOE Scientific and Technical Information. 01/01/1991. "conf-910166-4" "DE91006607" 8. Institute of Nuclear Materials Management (INMM) seminar on spent fuel management, Washington, DC (USA), 16-18 Jan 1991. Pope, R.B.; Rennich, M.J.; Attaway, C.R.; Medley, L.G. |
Physical Description: | Pages: (15 p) : digital, PDF file. |